Lowestoft 13 2006
Associated British Ports
Lowestoft
Local Notice to Mariners No 13 2006
Dredging Operations East side Carlton Swing Bridge
Mariners and Port Users are advised that dredging will be taking place off F Newsons Boat Yard with the split hopper barge Nab. The dredger will be working 5 days starting 25th/26th September 2006.
The Nab is 44m in length, 8.2m beam with a loaded draft of 2.28m
All vessels are advised to keep clear of the Nab when she is manoeuvring into position and on her trip to the deposit ground.
The vessel will be monitoring VHF 14.
Harbour Master
22nd September 2006