Environmental Standard Operating Procedures

This set of documents outlines the Broads Authority’s environmental standard operating procedures when conducting a range of practical and engineering works in the Broads.  The potential for negative environmental impact from such activities needs to be carefully considered prior to beginning works.

The likely impacts of each operation and how we control for them are outlined in each document.  These procedures will help guide both staff and contractors as to the most sensitive working practices, methods and timings to protect the environmental and ecological quality of the Broads.

1 Cutting Aquatic Plants in Navigation Channels (word document) [708kb]
ESOPS
2 Sediment Removal (word document) [598kb]

3 Bankside Sediment Disposal (word document) [294kb]

4 Tree and Scrub Clearance (word document) [147kb]

5 Dyke de-silting (word document) [144kb]

6 Bank Maintenance - Erosion Protection (word document) [205kb]

7 Sediment Dewatering and Land Spreading (word document) [573kb]

8 Mudpumping (word document) [207kb]

9 Boat Maintenance and Operation (word document) [789kb]Australian swamp stonecrop.jpg

10 Reed Rond Creation after Floodbank Set-back (word document) [1303kb]

11 Water Vole Mitigation for Disposal of Dredgings (word document) [300kb]

11b Water Vole Mitigation for Dyke Clearance (word document) [942kb]

12 Reptile Mitigation (word document) [608kb]

13 Otter Mitigation for River Corridor Works (word document) [994kb]

14  Breeding Bird Mitigation (word document) [173kb]

15 Bat Mitigation for Tree Removal Works (word document) [281kb]Mud pumping

16 Herbicide Application (word document) [165kb]

17 Floating Pennywort Eradication (word document) [156kb]

18 Himalayan Balsam Eradication (word document) [289kb]

19 Parrots Feather Eradication (word document) [153kb]

20 Japanese Knotweed Control (word document) [1466kb]

21 Ragwort Control (word document) [265kb]hogweed

22 Australian Swamp Stonecrop Control (word document) [215kb]

23 Giant Hogweed Control (word document) [5693kb]

24 Installation Replacement of Quay Heading or Piling (word document) [2515kb]

Broads Authority
Dragonfly House,
2 Gilders Way,
Norwich,
NR3 1UB, UK

Tel (01603) 610734
Contact us by email